Nation-Building a long march fueled by determination: Prabowo

id Prabowo Subianto,nation building,ev,battery,karawang

Nation-Building a long march fueled by determination: Prabowo

Sekretaris Kabinet Letkol Teddy Indra Wijaya (tengah) mendampingi Presiden Prabowo Subianto melakukan peletakan batu pertama (groundbreaking) ekosistem industri baterai kendaraan listrik terintegrasi di Artha Industrial Hills, Karawang, Jawa Barat, Minggu (29/6/2025). (ANTARA/HO-Biro Pers Sekretariat Presiden)

Karawang, West Java (ANTARA) - President Prabowo Subianto emphasized that building a nation is a long, demanding journey that requires perseverance and sacrifice.

“Nation-building is a long march,” he said at the groundbreaking ceremony for the Integrated Electric Vehicle (EV) Battery Industry Ecosystem project in Karawang on Sunday.He noted that every country follows its own path, citing China as an example of a nation that endured a difficult road to development.

Indonesia, too, has faced a prolonged struggle—from its fight for independence to realizing the ideals of justice, prosperity, and freedom from poverty and hunger, Prabowo said.

“These goals can only be achieved if a nation wisely manages the blessings given by the Almighty,” he stressed.

Prabowo underscored the importance of accelerating government programs, particularly industrial downstreaming, which he described as a key part of Indonesia’s economic transformation.

Baca juga: President hails Indonesia -China cooperation on battery industry

The Karawang EV battery project represents a significant breakthrough in the development of renewable and environmentally friendly energy, aligned with global sustainability goals.

Baca juga: Govt plans training, periodic evaluations for village co-ops

The ceremony was attended by several high-ranking officials, including Energy and Mineral Resources Minister Bahlil Lahadalia, Industry Minister Agus Gumiwang Kartasasmita, State-Owned Enterprises Minister Erick Thohir, and Chinese Ambassador Wang Lutong.

The 5.9 billion US dollars (95 trillion rupiah) project spans 3,023 hectares and is expected to generate up to 8,000 jobs and support 18 infrastructure projects, including a multifunctional port.


Pewarta :
Editor: I Komang Suparta
COPYRIGHT © ANTARA 2025

Dilarang keras mengambil konten, melakukan crawling atau pengindeksan otomatis untuk AI di situs web ini tanpa izin tertulis dari Kantor Berita ANTARA.